Six Representative Projects

Testing, investigation and remedial engineering — for developers, lenders, government and private clients.

  1. 0123-Storey Residential TowerIntegrity Testing
  2. 02Settling Warehouse FoundationSub-soil Investigation
  3. 03Heritage Office Block AssessmentIntegrity Testing
  4. 04Concrete Strength Survey, Housing EstateConcrete Strength Testing
  5. 05Coastal Plot Soil InvestigationSub-soil Investigation
  6. 06Mixed-Use Development Financing ReportIntegrity Testing
23-Storey Residential Tower01 / 06Lekki, Lagos · 2025Integrity Testing
  1. 23-Storey Residential Tower
    01Integrity Testing

    23-Storey Residential Tower

    Client
    Property Developer
    Location
    Lekki, Lagos
    Year
    2025
    Duration
    6 weeks

    The developer had design drawings and a contractor's warranty, but the lender wanted a third party to confirm the frame as built matched what had been approved. We surveyed the completed structure floor by floor, cored and tested concrete at every third level, and checked reinforcement against the issued-for-construction drawings.

    23Storeys verified

    Report accepted by the lender without a single follow-up query.

  2. Settling Warehouse Foundation
    02Sub-soil Investigation

    Settling Warehouse Foundation

    Client
    Construction Company
    Location
    Ikeja, Lagos
    Year
    2024
    Duration
    9 days on site

    Cracking had opened along one wall of a working warehouse and the owner had been quoted for full underpinning. We levelled the slab, opened inspection pits at four locations and tested the soil beneath the affected corner. The movement traced to a single poorly compacted fill zone, not to the foundation design.

    1/3Remedial cost avoided

    Root cause identified in one visit; remedial cost cut by a third.

  3. Heritage Office Block Assessment
    03Integrity Testing

    Heritage Office Block Assessment

    Client
    Government Project
    Location
    Victoria Island, Lagos
    Year
    2024
    Duration
    8 weeks

    A public building still in daily use needed a condition read before a refurbishment budget could be set. Testing had to be non-destructive and work around occupancy. We assessed the frame, facade and slabs over eight weeks of evening and weekend access, and ranked every defect found by structural consequence rather than by visibility.

    40 yrsStructure re-certified

    Cleared for continued occupation with a prioritised repair plan.

  4. Concrete Strength Survey, Housing Estate
    04Concrete Strength Testing

    Concrete Strength Survey, Housing Estate

    Client
    Property Developer
    Location
    Ajah, Lagos
    Year
    2023
    Duration
    3 weeks

    A batching inconsistency during construction put a whole phase of completed units in question. Breaking out samples would have meant making good across sixty finished homes. Rebound hammer and ultrasonic pulse velocity readings, calibrated against cores taken from a single sacrificial unit, established strength across the phase instead.

    60Units tested, zero opened

    Every unit verified without breaking a single wall.

  5. Coastal Plot Soil Investigation
    05Sub-soil Investigation

    Coastal Plot Soil Investigation

    Client
    Homeowner
    Location
    Epe, Lagos
    Year
    2023
    Duration
    2 weeks

    A private client bought a coastal plot and wanted to know what they were building on before an architect drew anything. Boreholes to eight metres found a competent bearing stratum shallower than the area's reputation suggested, which let the design proceed on pads rather than the piled solution that had been assumed.

    1Submission to approval

    Foundation redesign avoided; approvals secured on first submission.

  6. Mixed-Use Development Financing Report
    06Integrity Testing

    Mixed-Use Development Financing Report

    Client
    Bank
    Location
    Ikoyi, Lagos
    Year
    2022
    Duration
    5 weeks

    The bank was lending against a part-built mixed-use scheme and needed structural adequacy confirmed before drawing down the next tranche. We verified the completed substructure and frame against the design, and reported in the format the credit committee already used, so the findings could be actioned without translation.

    3Follow-on facilities

    Became the bank's standard reference for the borrower's next three projects.

Disciplines Applied

What The Work Draws On

Most projects call on more than one discipline — the record above spans all five.